Please Select Your Location

Australia
Österreich
België
Canada
Canada - Français
中国
Česká republika
Denmark
Deutschland
France
HongKong
Iceland
Ireland
Italia
日本
Korea
Latvija
Lietuva
Lëtzebuerg
Malta
Mexico
Nederland
New Zealand
Norge
Polska
Portugal
Russia
Saudi Arabia
Southeast Asia
España
Suisse
Suomi
Sverige
台灣
Ukraine
United Kingdom
United States
المملكة العربية السعودية (Arabic)

Step 7: Remove LoTo and Turn on Circuit Breaker Switch 3

Trainees must go back to the electrical panel room (Area 2), and remove the switch lock and the tag. They must then turn on the Circuit Breaker Switch 3.

If the trainee does not turn the Circuit Breaker Switch back on, power will not be restored to the pump.

If the trainee does not remove the tags to the Circuit Breaker Switch, they will receive a BAD score for the Used locks and tags correctly grade.

Submit
Thank You!